VALUE_STREAM Value Stream
All the actions, both value added and non-value added, currently required to bring a product through the main flows essential to every product: production flow from raw material to the customer, and design flow from concept to launch.
value stream, valuestream, value-stream, the stream
VALUE_STREAM_MAPPING Value Stream Mapping
A pencil and paper tool that helps you see and understand the flow of material and information as a product makes its way through the value stream.
value stream mapping, vsm, vsmap, material and information flow mapping, mifa
VALUE Value
What the end customer actually wants, specified from the customer's perspective; the reference against which every action is judged value-adding or waste.
value, customer value
MUDA Muda
Waste: any activity that consumes resources without creating value for the customer.
muda, waste, non value added, nva, non-value-added
MURA Mura
Unevenness in production volume or mix, which forces capacity and inventory to be sized for peaks.
mura, unevenness, variability
MURI Muri
Overburden on people or equipment, typically caused by unlevelled demand.
muri, overburden, overload
KAIZEN Kaizen
Continuous improvement; incremental change that eliminates waste.
kaizen, continuous improvement, ci
FLOW_KAIZEN Flow Kaizen
Improvement of material and information flow, requiring a high vantage point; management doing kaizen.
flow kaizen, value stream kaizen, system kaizen
PROCESS_KAIZEN Process Kaizen
Elimination of waste at the shop floor team level, focused on people and process flow.
process kaizen, point kaizen, shop floor kaizen
LEAN_MANUFACTURING Lean Manufacturing
Getting one process to make only what the next process needs when it needs it, linking all processes from consumer back to raw material in a smooth flow.
lean manufacturing, lean production, lean, tps, toyota production system
LEAN_THINKING Lean Thinking
The management philosophy of specifying value, identifying the value stream, creating flow, establishing pull, and pursuing perfection.
lean thinking
DOOR_TO_DOOR_FLOW Door-to-Door Flow
The production flow inside one plant, including shipment to the customer and delivery of supplied material — the level at which mapping should begin.
door to door, door-to-door, plant level flow, in-plant flow
PRODUCT_FAMILY Product Family
A group of products that pass through similar processing steps and over common equipment in your downstream processes.
product family, family, part family
MATERIAL_FLOW Material Flow
The movement of material through the factory, drawn left to right on the bottom half of the map.
material flow, physical flow, part flow
INFORMATION_FLOW Information Flow
The flow that tells each process what to make or do next, drawn right to left on the top half of the map.
information flow, info flow, schedule flow
TAKT_TIME Takt Time
How often you should produce one part, based on the rate of sales: available working time per shift divided by customer demand rate per shift.
takt time, takt, tact time, customer takt
TAKT_IMAGE Takt Image
The shared awareness of pace that exists only when work is released and withdrawn in small consistent increments.
takt image, sense of takt, pace awareness
CYCLE_TIME Cycle Time
The time that elapses between one part coming off a process and the next part coming off — not the total time a part takes through all steps.
cycle time, c/t, ct
CHANGEOVER_TIME Changeover Time
The time to switch a process from producing one product type to another.
changeover time, c/o, setup time, set-up time
PITCH Pitch
The consistent increment of work released and withdrawn at the pacemaker, usually takt time multiplied by pack size.
pitch, pitch increment, management time frame
PRODUCTION_LEAD_TIME Production Lead Time
The time it takes one part to make its way through the shop floor, from arrival as raw material to shipment to the customer.
production lead time, lead time, plt
PROCESSING_TIME Processing Time
The sum of the value-adding times for each process in the value stream.
processing time, value added time, va time
EVERY_PART_EVERY Every Part Every
A measure of production batch size expressed as the interval at which a process changes over to produce all its part variations.
every part every, epe, epex, every part every day
AVAILABLE_WORKING_TIME Available Working Time
Shift length minus breaks, meetings and cleanup — the numerator of takt time.
available working time, available time, net operating time
UPTIME Uptime
The fraction of time a machine actually runs when it is called upon to run.
uptime, on demand uptime, reliability, availability
REPLENISHMENT_LEAD_TIME Replenishment Lead Time
The time a pull loop takes to put withdrawn parts back into the supermarket.
replenishment lead time, replenishment time, refill lead time
CONTINUOUS_FLOW Continuous Flow
Producing one piece at a time, with each item passed immediately from one process step to the next without stagnation.
continuous flow
PUSH Push
A process producing something regardless of the actual needs of the downstream customer process and pushing it ahead, typically to a schedule.
push, batch and push, push production
PULL Pull
A method for controlling production between flows in which downstream withdrawal determines what the upstream process produces, when and how much.
pull, pull production, pull system
SUPERMARKET Supermarket
A controlled inventory of parts used to schedule production at an upstream process; the customer withdraws what it needs and the supplier replenishes.
supermarket, market, store, controlled store
MARKET_ADDRESS Market Address
The specified location in a supermarket where a replenished container must be placed.
market address, kanban address, store location
FIFO_LANE FIFO Lane
A capped, sequenced link between two decoupled processes; when it is full the supplying process must stop producing.
fifo lane, fifo, first in first out, conwip
SEQUENCED_PULL Sequenced Pull
The supplying process produces a predetermined quantity directly to the customer process's order, without a supermarket.
sequenced pull, golf ball system, build to sequence
KANBAN Kanban
A card or device that authorises production or conveyance of a specific quantity of a specific part.
kanban, card, signal card
PRODUCTION_KANBAN Production Kanban
The one-per-container kanban that tells a process how many of what may be produced and gives permission to do so.
production kanban, p kanban, make kanban
WITHDRAWAL_KANBAN Withdrawal Kanban
A card or device that instructs the material handler to get and transfer parts, for example from a supermarket to the consuming process.
withdrawal kanban, move kanban, conveyance kanban, transfer kanban
SIGNAL_KANBAN Signal Kanban
The one-per-batch kanban that signals when a reorder point is reached and another batch needs to be produced.
signal kanban, triangle kanban, batch kanban
KANBAN_POST Kanban Post
The place where kanban are collected and held for conveyance.
kanban post, kanban box, card rack, kanban mailbox
HEIJUNKA Heijunka
Levelling both the mix and the volume of production over a period of time, often using a box with a column per pitch and a row per product type.
heijunka, load levelling, load leveling, levelling box, oxox
PACED_WITHDRAWAL Paced Withdrawal
Regularly releasing a small consistent amount of production instruction at the pacemaker while taking away an equal amount of finished goods.
paced withdrawal, paced release, pitch release
PACEMAKER_PROCESS Pacemaker Process
The single process controlled by the outside customer's orders; how you control it sets the pace for all upstream processes.
pacemaker, pacemaker process, pace setter, scheduling point
LEVELLING_THE_MIX Levelling the Mix
Distributing the production of different products evenly over a time period rather than grouping them into long runs.
levelling the mix, leveling the mix, mix levelling, model mix levelling
LEVELLING_THE_VOLUME Levelling the Volume
Releasing and withdrawing consistent increments of work so the production pace is predictable.
levelling the volume, leveling the volume, volume levelling
INITIAL_PULL Initial Pull
The pull created at the pacemaker by releasing and withdrawing small consistent increments of work.
initial pull, starting pull
MILK_RUN Milk Run
A delivery route lining up several suppliers or customers so material can move frequently in small quantities.
milk run, milkrun, circuit delivery, consolidated route
SAFETY_STOCK Safety Stock
Inventory held as a hedge against problems such as downtime; should be temporary and released only under strict rules.
safety stock, hedge stock
BUFFER_STOCK Buffer Stock
Inventory held to protect against sudden fluctuations in customer orders.
buffer stock, buffer
ISOLATED_ISLAND Isolated Island
A process operating on its own schedule, disconnected from any downstream customer, setting batch sizes that suit itself rather than the value stream.
isolated island, island of functionality, disconnected process
GO_SEE_SCHEDULING Go See Scheduling
Adjusting schedules based on physically checking inventory levels; an informal practice that is not a true pull.
go see, go-see scheduling, visual scheduling
RIGHT_SIZED_TOOL Right-Sized Tool
Small, in-line equipment scaled to the product family's actual volume so it can join a continuous flow.
right sized tool, right-sized equipment, mini press
MONUMENT Monument
A large, fast, shared machine that cannot practically be dedicated to one family or slowed to takt.
monument, monument machine, shared fast process
CELL Cell
An arrangement placing process steps immediately adjacent so operators carry or pass parts from one step to the next.
cell, work cell, cellular manufacturing
VALUE_STREAM_LOOP Value Stream Loop
A segment of the future-state map between pulls, used to break implementation into manageable pieces.
value stream loop, loop, pacemaker loop
SETUP_REDUCTION Setup Reduction
Reducing changeover time so smaller batches can be run more frequently.
setup reduction, quick changeover
POKA_YOKE Poka-Yoke
A device that prevents an error, such as assembling the wrong component when all variants are kept at the line.
poka yoke, pokayoke, error proofing, mistake proofing, failsafe
STANDARDISED_WORK Standardised Work
A documented, repeatable work sequence that makes production consistent and predictable to takt.
standardised work, standardized work, standard work
TOTAL_PRODUCTIVE_MAINTENANCE Total Productive Maintenance
Maintenance practice aimed at eliminating the causes of unplanned downtime.
tpm, total productive maintenance, preventive maintenance
OPERATOR_BALANCE_CHART Operator Balance Chart
A bar chart of total cycle time per process or operator against the takt line.
operator balance chart, balance chart, yamazumi chart
WORK_ELEMENT Work Element
The smallest increment of work that can be moved between operators when balancing a cell.
work element, task element, work content element
TOTAL_WORK_CONTENT Total Work Content
The sum of operator work across a cell; divided by takt it gives the required manning.
total work content, work content, total manual time
POLICY_DEPLOYMENT Policy Deployment
Focusing the organisation on a small number of specific targets, deployed through the levels.
policy deployment, hoshin kanri, hoshin
POLICY_MANAGEMENT Policy Management
A more dynamic evolution of policy deployment in which lower levels help formulate policy as well as carry it out.
policy management
PLAN_BASED_TRIAL_AND_ERROR Plan-Based Trial and Error
Blending planning with trial and error: strive to accomplish the plan while accepting that deviations, once rigorously questioned, teach you something.
plan based trial and error, plan-based trial and error
VALUE_STREAM_REVIEW Value Stream Review
A periodic review, ideally conducted on the shop floor while walking the flow, that manages the exceptions rather than celebrating the wins.
value stream review, quarterly review, progress review
SENSEI Sensei
A teacher whose learning curve you can borrow.
sensei, teacher, lean sensei
CLOSE_TO_THE_OPERATION_SUPPORT Close-to-the-Operation Support
Treating all indirect operations as support for direct operations, with their work tied to the takt and pitch of value-adding operations.
close to the operation support, close-to-the-operation support
KAIZEN_WORKSHOP Kaizen Workshop
A focused improvement activity; effective only when applied strategically inside a value stream design.
kaizen workshop, kaizen event, kaizen blitz, improvement blitz
THEORY_OF_CONSTRAINTS Theory of Constraints
A constraint-focused improvement approach; in isolation it produces the same isolated victories over muda as a kaizen offensive.
theory of constraints, toc, bottleneck elimination
SIX_SIGMA Six Sigma
A variation-reduction initiative; without a value stream design it fixes visible quality problems without improving the whole.
six sigma, 6 sigma
MATERIAL_REQUIREMENTS_PLANNING Material Requirements Planning
A computerised system that consolidates customer and shop-floor information and sends instructions to each process; its shop-floor scheduling elements should be removed in a lean future state.
mrp, material requirements planning, erp scheduling
ELECTRONIC_DATA_INTERCHANGE Electronic Data Interchange
Electronic transmission of orders and forecasts, drawn with a lightning-wiggle information arrow.
edi, electronic data interchange
SHOP_ORDER Shop Order
An order released to the floor that follows a job through the production process; releasing them early is a source of expediting.
shop order, works order, production order
PRIORITY_LIST Priority List
A daily list issued to supervisors to sequence shop orders — a symptom of schedule churn.
priority list, daily priority list, hot list
FORECAST Forecast
Customer projection used for capacity planning; should not be used to schedule the shop floor day to day.
forecast, demand forecast, ninety day forecast
FROZEN_PERIOD Frozen Period
The near-term window in which a customer forecast is fixed.
frozen period, frozen horizon, frozen at thirty days
DAILY_RELEASE Daily Release
The customer's next-day requirement, typically transmitted overnight.
daily release, daily order, daily shipping requirement
SHIPPING_SCHEDULE Shipping Schedule
The instruction sent to the shipping department stating what must ship and when.
shipping schedule, despatch schedule, daily shipping schedule
MAKE_TO_ORDER Make to Order
Production triggered by a confirmed customer order, common where configurations vary greatly.
make to order, mto, build to order
MAKE_TO_STOCK Make to Stock
Production to replenish a finished-goods store from which the customer pulls.
make to stock, mts, build to stock
BUILD_TO_SHIPPING Build to Shipping
Producing to the shipping schedule with no finished-goods supermarket; requires reliability or more safety stock.
build to shipping, direct to shipping, produce to shipping
ORDER_BACKLOG Order Backlog
Accumulated unfulfilled orders, which tempts firms to quote longer lead times rather than shorten them.
order backlog, backlog, open order book
EXPEDITING Expediting
Manual intervention to accelerate specific orders, caused by releasing work too early and by late mix changes.
expediting, expedite, chasing, firefighting
PROCESS_BOX Process Box
The icon indicating one area of material flow, ideally a continuous flow; it stops wherever processes are disconnected.
process box, process, operation box
DATA_BOX Data Box
The box under a process recording cycle time, changeover, uptime, available time and other process data.
data box, databox, attribute box
INVENTORY_TRIANGLE Inventory Triangle
The icon capturing the location and amount of accumulated inventory, annotated with quantity and time.
inventory triangle, warning triangle, stock triangle
OUTSIDE_SOURCE Outside Source
The icon used for customers, suppliers and outside manufacturing processes.
outside source, factory icon, external source
TIMELINE Timeline
The stepped line under the process boxes and triangles that compiles lead time and value-adding time.
timeline, lead time bar, saw tooth line
KAIZEN_BURST Kaizen Burst
The icon highlighting an improvement need critical to achieving the value stream vision.
kaizen burst, lightning burst, kaizen lightning
CURRENT_STATE_MAP Current-State Map
The map of how the value stream operates today, drawn from information gathered by walking the flow.
current state map, current state, as is map
FUTURE_STATE_MAP Future-State Map
The lean design to be implemented within a short period; the most important of the maps.
future state map, future state, to be map, ideal state map
YEARLY_VALUE_STREAM_PLAN Yearly Value Stream Plan
A one-page plan stating step by step what will be done by when, with measurable goals and named reviewers.
yearly value stream plan, value stream plan, annual plan
LEVELS_OF_MAPPING Levels of Mapping
Process level, single plant door-to-door, multiple plants, and across companies — the scales at which a value stream can be mapped.
levels of mapping, magnification, zoom level
PACK_SIZE Pack Size
The number of parts one finished-goods container holds; commonly the basis for kanban size and pitch.
pack size, packout quantity, container quantity
CONTAINER Container
The unit in which parts are held and moved; should be sized for the operator, not the material handler.
container, bin, tray, tote, basket
OPERATOR_ICON Operator Icon
A person viewed from above, drawn in the process box to show manning.
operator icon, person icon
TRIGGER_POINT Trigger Point
The supermarket level at which a signal kanban is sent to launch another batch.
trigger point, reorder point, minimum point
INVENTORY_TURNS Inventory Turns
How many times inventory is consumed and replaced in a year; the financial mirror of production lead time.
inventory turns, stock turns, turnover
VALUE_ADDED_RATIO Value-Added Ratio
Processing time divided by production lead time — the ratio the map exists to expose.
value added ratio, flow efficiency, process cycle efficiency
SCRAP_RATE Scrap Rate
The fraction of output that must be scrapped or reworked.
scrap rate, reject rate, rework rate
FIRST_TIME_THROUGH First Time Through
The fraction of parts that clear a process with no rework, measured at the process rather than at final inspection.
first time through, ftt, first pass yield, fpy, first time right, ftr
PROCESS_CAPACITY Process Capacity
Available work time divided by cycle time, multiplied by uptime; a measure of current capacity if no changeovers are made.
process capacity, demonstrated capacity
BATCH_SIZE Batch Size
The quantity produced between two changeovers.
batch size, lot size, run size
DAYS_OF_SUPPLY Days of Supply
Inventory quantity divided by the daily customer requirement.
days of supply, days on hand, inventory days
DISTANCE_TRAVELLED Distance Travelled
The distance material moves through the plant; a proxy for transport waste.
distance travelled, distance traveled, travel distance
ON_TIME_DELIVERY On-Time Delivery
The fraction of shipments delivered when the customer required them.
on time delivery, otd, delivery performance
VALUE_STREAM_MANAGER Value Stream Manager
The person with lead responsibility for understanding and improving a product family's value stream, reporting to the top person on site.
value stream manager, flow manager, product family manager
LEAN_SPECIALIST Lean Specialist
A coach who helps value stream managers see waste and introduce the practices that remove its sources.
lean specialist, lean promotion group, lean coach
MATERIAL_HANDLER Material Handler
The person who withdraws kanban at the pitch increment and moves containers between supermarket, cell and staging.
material handler, water spider, kanban runner
PRODUCTION_CONTROL Production Control
The department that receives customer orders, levels them, and sends instruction to the single scheduling point.
production control, planning department, material control
CHANGE_AGENT Change Agent
The person who drives the lean transformation forward, ideally the one asking the question.
change agent
PRODUCT_TEAM Product Team
An organisation focused on a product family rather than a department.
product team, value stream team
COIL Coil
A supplier pack unit that cannot be broken; the supplier can deliver any number of full coils but not a partial one.
coil, steel coil, coiled steel
OUTSIDE_VENDOR Outside Vendor
An operation performed off site, such as painting, which adds transport and lead time in the middle of the stream.
outside vendor, outside process, subcontractor, external operation
RECEIVING_DOCK Receiving Dock
The plant boundary where supplied material arrives and where an inbound supermarket can be held.
receiving dock, goods inward, inbound dock
STAGING_AREA Staging Area
Where finished goods are assembled according to the shipping schedule before loading.
staging area, shipping lane, marshalling area
FINISHED_GOODS Finished Goods
Completed product held before shipment, either in a supermarket the customer pulls from or staged directly for shipping.
finished goods, fg, finished stock
WORK_IN_PROCESS Work in Process
Partly finished material between process steps.
work in process, wip, work in progress
RAW_MATERIAL Raw Material
Supplied material before the first process, drawn at the far left of the map.
raw material, raw stock, incoming material
RETURNABLE_PACKAGING Returnable Packaging
Customer-specified packaging that circulates between plants and constrains pack size.
returnable packaging, returnable trays, reusable container
LINE_BALANCING Line Balancing
Assigning work elements to operators so the operator times are as even as possible and no element starts before its predecessors finish.
line balancing, line balance, balancing, station balancing, assembly line balancing
PRECEDENCE_DIAGRAM Precedence Diagram
A left-to-right chart of which work elements must be completed before others can begin; the blueprint a balance has to obey.
precedence diagram, precedence graph, precedence network, predecessor diagram
PREDECESSOR_ELEMENT Predecessor Element
A work element that must be finished before another can start, constraining which operator can be given the later element.
predecessor element, immediate predecessor, preceding element, predecessor
UNIT_TIME Unit Time
The sum of the standard element times, being the total work required to build one unit; written Σtₑ.
unit time, total unit time, standard work time per unit, sum of element times
SHIFT_TIME Shift Time
Total working time in one shift after lunch and breaks are taken out; the T in the manning and cycle time formulas.
shift time, shift working time, net shift time
SHIFT_SCHEDULE_QUANTITY Shift Schedule Quantity
The number of finished units the shift is meant to complete; the N that fixes both the cycle time and the number of operators.
shift schedule, shift schedule quantity, shift quantity, units per shift
AVERAGE_OPERATOR_TIME Average Operator Time
Unit time divided by the number of operators: the work each operator would carry if the work divided perfectly evenly.
average operator time, average operation time, average station time
EFFECTIVE_CYCLE_TIME Effective Cycle Time
The largest of the operator times, and so the real interval between finished units, however fast the schedule asked the line to run.
effective cycle time, achieved cycle time, actual cycle time
BALANCE_DELAY Balance Delay
The share of paid operator time spent idle because work was assigned unevenly: the gap between the effective cycle time and the average operator time, as a fraction of the former.
balance delay, balancing loss, idle time fraction, balance loss
EFFICIENCY_RATIO Efficiency Ratio
Average operator time divided by effective cycle time; the complement of balance delay, so the two always sum to one.
efficiency ratio, line efficiency, balance efficiency
PARALLEL_STATION Parallel Station
Two or more identical stations working alternate units, used when one element takes longer than takt and cannot be divided.
parallel station, parallel stations, duplicate station, parallel work place
LABOR_GROUP Labor Group
A set of operators whose work elements are mutually exclusive from every other set, such as a paint booth or a feeder line, each with its own schedule and cycle time.
labor group, labour group, labor groups
FEEDER_LINE Feeder Line
A line that builds a component fed into the main line, synchronised to it so the two flows stay in step.
feeder line, feeder lines, subassembly line, sub assembly line
MIXED_MODEL_ASSEMBLY Mixed Model Assembly
One line building two or more models at the same time, balanced on the work each element takes over the whole shift rather than on one unit.
mixed model assembly, mixed model line, mixed model
USAGE_INDEX Usage Index
Whether a given work element is used by a given model; what makes mixed-model balancing differ from single-model balancing.
usage index, element usage, model usage index
MAKE_TO_ORDER_ASSEMBLY Make to Order Assembly
Assembly where each unit is a customer order with its own combination of features and options, so the element times at a station vary unit by unit.
make to order assembly, make-to-order assembly, mto assembly, order driven assembly
SIMILARITY_INDEX Similarity Index
The share of work content a set of models holds in common; a numeric test of whether they belong on one line and one map.
similarity index, model similarity, commonality index
BILL_OF_MATERIAL Bill of Material
The parts and quantities needed for one unit, which combined with the balance gives the parts each station must be stocked with for a shift.
bill of material, bill-of-material, bom, parts list
PRIME_ELEMENT Prime Element
The first work element to use a given part, which is what decides the station that part must be delivered to.
prime element, first element using part
SHOP_FLOOR_MANAGEMENT Shop Floor Management
Leading at the point of value creation rather than from an office: managers observe the process where it runs and support it, resting on four interlocking elements — visual management, a communication structure, a problem-solving process, and standard-based process observation.
shop floor management, shopfloor management, sfm, management at the shop floor, lead on the spot
VISUAL_MANAGEMENT Visual Management
Making the state of a process visible where it runs, so a deviation from the standard is seen by the people who can answer it rather than reported upwards later.
visual management, visual control, visual factory, shopfloor board, management board
KEY_FIGURE Key Figure
A number carried on the shop floor board to show whether a process is meeting its standard; useful only while it is current, since short-cycle management cannot act on a figure that describes last month.
key figure, key figures, shopfloor key figure, kpi, key performance indicator, key performance indicators
SHORT_CYCLE_CONTROL Short Cycle Control
Managing a process in fixed short intervals — the shift, the hour, the pitch — so a deviation is caught within the interval it happened in instead of at the end of the month.
short cycle control, short-cycle control, short cycle management, short interval control, short-cycle basis
DEVIATION_FROM_STANDARD Deviation from Standard
The gap between what a process is doing and the standard that describes it; the only trigger shop floor management acts on, and the reason a standard must exist before an improvement can be claimed.
deviation from standard, deviation from the standard, standard deviation from work, off standard, abnormality
STANDARD_BASED_PROCESS_OBSERVATION Standard-Based Process Observation
Watching a running process against its written standard, which is what turns a standard from a document into a check that the work is still being done the way it was agreed.
standard based process observation, standard-based process observation, process observation, process confirmation
ESCALATION Escalation
The agreed route by which an unanswered deviation reaches the next management level, pulled by the process the way a kanban is pulled by consumption rather than pushed by a report.
escalation, escalation path, escalation ladder, call for support
PROBLEM_SOLVING_PROCESS Problem-Solving Process
A defined sequence for taking a deviation to its cause and a countermeasure, so problems are closed by evidence rather than by opinion.
problem solving process, problem-solving process, structured problem solving, eight disciplines, 8d
GEMBA_WALK Gemba Walk
Going to the place where the work happens to see the process for oneself; the habit that makes every other shop floor practice possible.
gemba walk, gemba, go and see, walk the floor, shop floor walk
A3_REPORT A3 Report
A problem, its analysis, its countermeasures and its follow-up set out on one sheet, so the reasoning is visible and can be argued with.
a3 report, a3, a3 sheet, one page report
PDCA_CYCLE PDCA Cycle
Plan, do, check, act: the loop that makes an improvement an experiment with a result rather than a change with an opinion.
pdca, pdca cycle, plan do check act, plan-do-check-act, deming cycle, demings cycle
IMPROVEMENT_KATA Improvement Kata
A repeated routine for improving towards a target condition in small steps, each step a PDCA cycle, so the capability to improve is practised rather than assumed.
improvement kata, kata, coaching kata, toyota kata
TARGET_CONDITION Target Condition
The state a process is to reach next, described precisely enough that reaching it is a fact rather than a judgement; the object of the improvement kata.
target condition, target state, next target condition
JIDOKA Jidoka
The second pillar of the Toyota Production System: a process detects its own abnormality and stops, decoupling the operator from the machine so a defect is contained where it was made instead of being passed on.
jidoka, autonomation, automation with a human touch, quality at the source, built in quality
ANDON Andon
Japanese for lantern: the signal a process raises when it cannot meet its standard, and — as a board combining several signals in one place — the means by which support knows where to go without being told.
andon, andon board, andon cord, andon light, signal lamp
OVERALL_EQUIPMENT_EFFECTIVENESS Overall Equipment Effectiveness
Good parts against what the planned working time could have produced, as the product of the availability, performance and quality factors; it deliberately excludes utilisation losses, because time nobody scheduled is not a loss the process caused.
oee, overall equipment effectiveness, equipment effectiveness, plant effectiveness
AVAILABILITY_FACTOR Availability Factor
Production time over possible operating time: the share of scheduled time the plant was actually able to run, lost to breakdowns, adjustment and set-up.
availability factor, technical availability, plant availability
PERFORMANCE_FACTOR Performance Factor
Parts produced against the target output for the time the plant ran: what short stops, idling and reduced speed cost, once availability has already been accounted for.
performance factor, performance rate, speed factor, performance efficiency
QUALITY_FACTOR Quality Factor
Good parts over produced parts, counting rework as a loss; the third factor of OEE.
quality factor, quality rate, yield factor
UTILISATION_FACTOR Utilisation Factor
Possible operating time over the twenty-four hours of a day. It is the one loss OEE leaves out, and reporting it in place of effectiveness is what makes a plant chase running time instead of good parts.
utilisation factor, utilization factor, plant utilisation, plant utilization
MASTER_ROUTE_SHEET Master Route Sheet
The document listing every operation a part passes through with its times and resources; the source a current-state map is checked against once the flow has been walked.
master route sheet, route sheet, routing sheet, process route sheet
ECONOMICAL_BATCH_QUANTITY Economical Batch Quantity
The batch size at which set-up cost and holding cost balance. It is an answer to a question lean changes: reduce the set-up and the economical batch falls, which is why quick changeover comes before batch-size arithmetic.
economical batch quantity, ebq, economic batch quantity, economic order quantity, eoq
RETURN_ON_INVESTED_CAPITAL Return on Invested Capital
Operating profit against the capital tied up to earn it; the measure through which inventory reduction and floor space released show up as a business result rather than a shop floor one.
return on invested capital, roic, return on capital
OPERATOR_CYCLE_TIME Operator Cycle Time
The time one operator spends on a unit, including walking, loading and any work done while the machine runs. It is the figure a cell is balanced on, not the machine's automatic time.
operator cycle time, operator ct, manual cycle time, associate cycle time
MACHINE_CYCLE_TIME Machine Cycle Time
The time the machine runs unattended after it has been loaded. In a cell this is in-cycle only when the operator has other work to do while it runs; otherwise the operator waits on the machine.
machine cycle time, automatic cycle time, auto cycle, machine auto time, automatic time
IN_CYCLE_WORK In-Cycle Work
Operator work that can be done while the machine is running. Moving work into the automatic cycle is how a cell absorbs walking and loading without adding stations.
in cycle work, in-cycle work, work during auto, internal work
OUT_OF_CYCLE_WORK Out-of-Cycle Work
Operator work that can only be done while the machine is stopped — load, unload, inspect. It sets a floor under the operator cycle that no amount of walking reduction will beat.
out of cycle work, out-of-cycle work, external work at the machine
STANDARD_WIP Standard WIP
The exact number of pieces a cell is allowed to hold so one-piece flow stays one-piece. More than the standard is overproduction; less starves the next operator.
standard wip, standard work in process, standard in-process stock, swip, fixed wip
WORK_COMBINATION_TABLE Work Combination Table
The sheet that plots each operator's manual work, walking and machine auto time against takt, so a cell can be manned from evidence rather than from habit.
work combination table, work combo table, operator balance table, standard work combination sheet
FIXED_POSITION_STOP Fixed-Position Stop
A line that stops only at a station boundary when a problem is pulled, so a defect is contained without crashing mid-cycle work.
fixed position stopping, fixed position stopping system, fixed position stop, line stop at station
MULTI_MACHINE_HANDLING Multi-Machine Handling
One operator running several machines in a cell, possible only when walking is short and machine auto time covers the walk to the next load.
multi machine handling, multi-machine handling, one operator several machines
U_SHAPED_CELL U-Shaped Cell
A cell laid out so the operator starts and finishes at the same end, cutting walk and making manning flexible: one person can run the whole U, or several can split it, without moving machines.
u-shaped cell, u cell, u-cell, horseshoe cell
ONE_PIECE_FLOW One-Piece Flow
Moving one unit at a time to the next step as soon as the work is done. Batching inside a cell is still a batch, however small the cell looks on the map.
one piece flow, one-piece flow, 1x1 flow, single piece flow
CROSS_TRAINING Cross-Training
Operators who can run more than one station in the cell, which is what lets manning follow takt instead of following job titles.
cross training, cross-training, multi skill, multi-skill, flexible operators
INTERNAL_SETUP Internal Setup
Setup work that can only be done while the machine is stopped. SMED's first move is to stop treating external work as internal.
internal setup, internal changeover, inside setup, ied
EXTERNAL_SETUP External Setup
Setup work that can be done while the machine is still running the previous job — staging the next die, preheating, fetching tools.
external setup, external changeover, outside setup, oed
SINGLE_MINUTE_EXCHANGE_OF_DIE Single-Minute Exchange of Die
Shingo's method for taking a changeover under ten minutes: separate internal from external, convert internal to external, then streamline what must still stop the machine.
smed, single minute exchange of die, smed system, single-minute exchange, quick die change
ONE_TOUCH_EXCHANGE One-Touch Exchange
A changeover reduced to a single motion, the end-state SMED aims at once internal work has been designed out.
one touch exchange, oted, one-touch exchange of die
SOURCE_INSPECTION Source Inspection
Checking the conditions that cause a defect before the defect can be made, rather than inspecting the part after. Shingo's name for the only inspection that can reach zero defects.
source inspection, source check, inspection at the source
JUDGMENT_INSPECTION Judgment Inspection
Sorting good from bad after the fact. It finds defects; it does not prevent them, and it does not belong in a future-state data box as a quality strategy.
judgment inspection, sorting inspection, go no-go inspection
INFORMATIVE_INSPECTION Informative Inspection
Sampling after the fact to feed information back. Faster than judgment inspection at reducing defects, still too late to reach zero.
informative inspection, statistical inspection, spc inspection
SELF_CHECK Self-Check
The operator inspects the unit they just made, immediately. Faster feedback than a downstream inspector, still a check after the error.
self check, self-check, operator self inspection
SUCCESSIVE_CHECK Successive Check
The next process inspects the last process's work before starting its own. Catches what self-check missed; still not source inspection.
successive check, successive inspection, next process check
ZERO_QUALITY_CONTROL Zero Quality Control
Shingo's system: source inspection plus poka-yoke, aimed at zero defects rather than at an acceptable quality level.
zero quality control, zqc, zero qc, zero defects system
POKA_YOKE_DEVICE Poka-Yoke Device
A physical contact, counting or motion-step device that either stops the process when a condition is wrong or prevents the wrong action from being possible.
poka-yoke device, mistake proofing device, error proofing device, failsafe device
PROCESS_VERSUS_OPERATION Process versus Operation
Shingo's distinction: a process is the path a product takes; an operation is what a person or machine does at one place. Improving operations inside a wasteful process leaves the waste.
process and operation, network of processes and operations, process versus operation, process vs operation
NON_STOCK_PRODUCTION Non-Stock Production
Producing without the warehouses that batch-and-queue treats as normal. The aim of TPS as Shingo wrote it, not a side effect of faster machines.
non stock production, non-stock production, stockless production
A3_THINKING A3 Thinking
Using a single sheet to make the problem, the reasoning and the proposed action visible so a manager coaches judgment rather than issuing answers. The sheet is the residue; the conversation is the work.
a3 thinking, a3 management, managing to learn
NEMAWASHI Nemawashi
Preparing the roots before the tree is moved: talking the proposal through with everyone it will touch, so the decision when it comes is already understood.
nemawashi, root binding, consensus building
CATCHBALL Catchball
Passing a proposal up and down the organisation so each level adds what only it can see, rather than cascading a finished plan.
catchball, catch ball, hoshin catchball
PROBLEM_SOLVING_A3 Problem-Solving A3
An A3 whose left side states the background, current condition, goal and root cause, and whose right side states countermeasures, a plan and follow-up.
problem solving a3, problem-solving a3, a3 problem solving
PROPOSAL_A3 Proposal A3
An A3 written to recommend a course of action, still built on a current-condition and a gap, so the recommendation can be argued with.
proposal a3, a3 proposal
VALUE_STREAM_MANAGEMENT Value Stream Management
The eight-step process that turns a map into a managed programme: commit, choose the family, learn lean, map current, map future, kaizen plans, implement, and keep the gains.
value stream management, vsm process, vsmp, value stream management process
KAIZEN_PLAN Kaizen Plan
The dated, named actions that take a future-state map off the wall and onto the floor, loop by loop, with a reviewer for each step.
kaizen plan, implementation plan, loop plan
DEMAND_AMPLIFICATION Demand Amplification
The way a small change in customer demand becomes a large swing upstream when each process adds its own batch, forecast and safety. The map shows it as inventory triangles growing toward the supplier.
amplified as you move upstream, demand amplification, bullwhip, schedule amplification
PERCENT_COMPLETE_AND_ACCURATE Percent Complete and Accurate
The share of work a process receives that it can act on without going back for missing or wrong information. Rolled across the stream it is the information-flow twin of first-time-through.
percent complete and accurate, %c&a, c&a, complete and accurate, percent c and a, rolled c&a
PROCESS_TIME Process Time
The time someone is actually working on the item. Martin and Osterling keep it separate from lead time so a box that is busy for minutes and waits for days cannot hide behind one number.
process time, touch time, work time, hands-on time
LEAD_TIME_VERSUS_PROCESS_TIME Lead Time versus Process Time
The gap the timeline exists to show: how long the item waits versus how long it is worked. A practical map states both, or it is a process list.
process time and lead time, lead time versus process time, wait versus work
VALUE_CREATING_TIME Value-Creating Time
Work the customer would pay for, as distinct from necessary non-value work (compliance, changeover) and pure waste. A data box that only has cycle time cannot make that cut.
value creating time, value-creating time, value creating, necessary non value adding
PAPER_KAIZEN Paper Kaizen
Leaving wasteful work elements out while the cell is still on paper. Rother and Harris insist on it before any machine moves, because waste designed out costs nothing and waste built in has to be removed twice.
paper kaizen, kaizen on paper, paper improvement
LEVELS_OF_AUTOMATION Levels of Automation
The ladder from a machine that only cuts to one that loads, cycles, unloads and ejects unaided. The great divide is auto-eject: below it an operator must stand and wait for the part, above it the operator can walk to the next machine, which is what makes multi-process handling possible at all.
levels of automation, automation level, level 3 automation, great divide in automation
AUTO_EJECT Auto-Eject
The machine returns the finished part on its own. Rother and Harris call for it wherever the operator needs both hands on the part, because without it the part is double-handled and the cell pays for the same motion twice.
auto eject, auto-eject, automatic ejection, part ejection
CONCENTRATED_WAITING Concentrated Waiting
Loading every operator but one to nearly a full takt and leaving the remaining slack on a single operator, rather than spreading the idle time thinly across the cell. Spread evenly, the waste is invisible and permanent; concentrated, it is the next kaizen and can be removed.
concentrated waiting, concentrate the waiting, load all but one operator, waiting on one operator
MULTI_PROCESS_HANDLING Multi-Process Handling
One worker taking a part through several *different* processes, laid out in flow order. Shingo's worked example puts two workers through three processes and gains 27% on output per worker without buying a machine, because the part stops waiting between operations.
multi process handling, multi-process handling, multiprocess handling, handling several processes
MULTIPLE_MACHINE_HANDLING Multiple Machine Handling
One worker minding several machines doing the *same* operation. It raises machine utilisation and leaves the part waiting between processes, which is why Shingo treats it as the weaker of the two arrangements and multi-process handling as the aim.
multiple machine handling, several machines one worker, machine handling operation
NAGARA_SYSTEM Nagara System
Carrying out dissimilar operations in one smooth movement rather than as separate scheduled steps. Shingo puts it alongside levelling as the way a plant absorbs mix without holding stock between operations.
nagara, nagara system, smooth production flow
PRE_AUTOMATION Pre-Automation
Separating worker from machine and giving the machine the ability to stop itself, without buying full automation. Shingo's point is that almost all the benefit of automation comes from this step, and almost all the cost comes after it.
pre automation, pre-automation, autonomation with a human touch, toward pre-automation
LOAD_AND_CAPACITY_BALANCE Load and Capacity Balance
Load is the work that has to be done; capacity is what machine and operator can do. Toyota calls holding the two in balance "levelling", and Shingo's instruction for reaching it is to round down the peaks and fill in the valleys at the final process.
load and capacity, balancing load and capacity, excess capacity, load versus capacity
LOT_DELAY Lot Delay
The wait a finished piece spends beside the rest of its lot before the lot moves. It is invisible in cycle time and it is most of the lead time in batch production, which is why Shingo separates it from process delay.
lot delay, lot waiting, batch delay
PROCESS_DELAY Process Delay
The wait a whole lot spends before the next process can take it. Shingo pairs it with lot delay so a map can say which of the two a countermeasure would actually remove.
process delay, process waiting, queue delay
ORDER_POINT_METHOD Order Point Method
Replenishing when stock falls to a calculated point rather than to a schedule. Shingo treats it as the ancestor of kanban and is explicit about the limit: it regulates quantity well and does nothing about overproduction between the points.
order point, order point method, o.p. method
CONTROL_METHOD_POKA_YOKE Control Method Poka-Yoke
A poka-yoke that stops the machine or the line when the condition is wrong. Shingo's preferred regulatory function, because it does not depend on anyone noticing.
control method, control type poka-yoke, shutdown poka-yoke
WARNING_METHOD_POKA_YOKE Warning Method Poka-Yoke
A poka-yoke that raises a buzzer or a light and lets production continue. Shingo rates it a weaker regulatory function precisely because defects keep coming if the signal is missed.
warning method, warning type poka-yoke, alarm poka-yoke, buzzer or light
CONTACT_METHOD Contact Method
Detecting the wrong condition by physical contact — a pin, a limit switch, a shape that will not seat. The most robust of the three setting methods because it needs no counting and no attention.
contact method, contact poka-yoke, physical contact detection
FIXED_VALUE_METHOD Fixed-Value Method
Detecting an abnormality by checking that a fixed number of motions or parts happened — ten strips of tape, six screws. Shingo's answer to the operation that is right only when it is complete.
fixed value method, fixed-value method, constant value method, counting poka-yoke
MOTION_STEP_METHOD Motion-Step Method
Detecting an abnormality by checking that the steps happened in the required order. It catches the omission that leaves a good-looking part with a step missing.
motion step method, motion-step method, sequence poka-yoke, step sequence check
ONE_HUNDRED_PERCENT_INSPECTION One Hundred Percent Inspection
Checking every piece rather than a sample. Shingo's argument is that this is affordable only when the check is built into the process as a poka-yoke; done by people it is expensive, tiring and still misses defects.
100 percent inspection, one hundred percent inspection, full inspection
FOUR_CONCEPTUAL_STAGES_OF_SMED Four Conceptual Stages of SMED
Preliminary: internal and external setup are not distinguished. Stage 1: separate them. Stage 2: convert internal to external. Stage 3: streamline every remaining element. The order is the method; skipping to stage 3 buys minutes where stages 1 and 2 buy hours.
four conceptual stages, smed stages, four stages of smed
FUNCTIONAL_CLAMP Functional Clamp
A fastening that holds with one motion — pear-shaped hole, U-slot, cam — instead of a bolt that has to be wound out along its whole thread. Shingo's point about bolts is that only the last turn tightens and only the first loosens; the rest is waste.
functional clamp, functional clamping, one turn attachment, one-turn attachment
BOLTLESS_METHOD Boltless Method
Holding the die or tool without threaded fasteners at all — wedges, springs, magnets, taper pins. The end of the road that functional clamping starts down.
boltless method, boltless fastening, no bolt clamping
INTERMEDIATE_JIG Intermediate Jig
A standard plate the next tool is set up on off-line, so the machine only ever receives one shape. It converts centring and squaring — classic internal work — into external work.
intermediate jig, intermediate jigs, standard mounting plate
DIE_HEIGHT_STANDARDISATION Die Height Standardisation
Making every die the same working height so shut-height adjustment disappears. Shingo is emphatic that eliminating an adjustment beats automating it.
die height, die heights, standardise die height, shut height standardisation
PARALLEL_SETUP_OPERATIONS Parallel Setup Operations
Two people working the changeover at once, front and back of the press, so a twelve-minute setup becomes six rather than twelve minutes of one person walking around the machine.
parallel operations, parallel setup, two person changeover
ADJUSTMENT_ELIMINATION Adjustment Elimination
Replacing "set it and try it" with fixed settings, gauges and stops. Adjustment is the part of a changeover that has no fixed duration, which is why it dominates the times nobody can predict.
adjustment elimination, eliminate adjustment, no adjustment setup
ACTIVE_IMPROVEMENT Active Improvement
Changing what is made and how it is designed to be made, rather than working faster at what already exists. Shingo pairs it with passive improvement and is clear which one has the bigger ceiling.
active improvement, improvement of the object
PASSIVE_IMPROVEMENT Passive Improvement
Accepting the object and the process as given and improving the motions inside them. Necessary, bounded, and the trap a plant falls into when it never asks whether the operation should exist.
passive improvement, improvement of the method only
LOW_VOLUME_MIXED_MODEL_PRODUCTION Low-Volume Mixed-Model Production
Making many variants in small quantities to order. Shingo's treatment is the answer to the objection that levelling only works for high volume: it is changeover, not volume, that decides whether mixed models can be run.
low volume mixed model, mixed model production, build to order production, low volume production
BUFFER_RESOURCES Buffer Resources
Resources held ready to absorb variation in what the customer asks for, so takt can still be met when the volume is not exactly what was planned. They have to be available immediately — a buffer that needs a budget conversation is not a buffer.
buffer resource, buffer resources
SAFETY_RESOURCES Safety Resources
Resources held against the plant's own failures — an absent person, a system down — as opposed to buffer resources, which cover variation in demand. Keeping the two separate stops one shortage being explained away by the other.
safety resource, safety resources
PITCH_BOARD Pitch Board
A board that releases work by pitch increment and shows, within the increment, whether the pace is being held. Its virtue is that a problem is visible in one pitch rather than at the end of the day.
pitch board, pitch increment board
RUNNER Runner
The person who moves work and kanban on a fixed route at the pitch. Tapping and Shuker's image is a post office: the heijunka box holds the mail and the runner delivers it on a timetable.
runner, material handler route, pitch runner
IN_PROCESS_SUPERMARKET In-Process Supermarket
A controlled store of work between two office processes, picked from rather than pushed into, so the downstream process takes what it can do and the upstream process replenishes what was taken.
in-process supermarket, in process supermarket, office supermarket
LEAN_METRICS Lean Metrics
The few measures a value stream is actually steered by, chosen so each one can be broken into components that name a specific waste. A measure that cannot be decomposed cannot direct an improvement.
lean metrics, lean measurables, office metrics
PULL_BASED_AUTHORITY Pull-Based Authority
Authority earned by taking responsibility at the level where the work happens, rather than issued with a job title. Shook separates responsibility from authority deliberately: the A3 owner has the first and has to pull the second.
pull based authority, pull-based authority, authority pulled not granted
RESPONSIBILITY_WITHOUT_AUTHORITY Responsibility Without Authority
The normal condition of an A3 owner, and the point of the method rather than a flaw in it: agreement has to be won from the people who hold the resources, which is what makes the reasoning on the sheet matter.
responsibility and authority, responsibility without authority, ownership without authority
ACTIVITY_RATIO Activity Ratio
Total process time divided by total lead time, printed on the map header beside rolled %C&A. On the book's own example map it is 3.9%, which is the number that ends the argument about whether the stream is busy or waiting.
activity ratio, process time over lead time, activity rate