term 234
| Key | Name | Detail | Aliases |
|---|---|---|---|
VALUE_STREAM |
Value Stream |
All the actions, both value added and non-value added, currently required to bring a product through the main flows essential to every product: production flow from raw material to the customer, and design flow from concept to launch.
|
value stream, valuestream, value-stream, the stream |
VALUE_STREAM_MAPPING |
Value Stream Mapping |
A pencil and paper tool that helps you see and understand the flow of material and information as a product makes its way through the value stream.
|
value stream mapping, vsm, vsmap, material and information flow mapping, mifa |
VALUE |
Value |
What the end customer actually wants, specified from the customer's perspective; the reference against which every action is judged value-adding or waste.
|
value, customer value |
MUDA |
Muda |
Waste: any activity that consumes resources without creating value for the customer.
|
muda, waste, non value added, nva, non-value-added |
MURA |
Mura |
Unevenness in production volume or mix, which forces capacity and inventory to be sized for peaks.
|
mura, unevenness, variability |
MURI |
Muri |
Overburden on people or equipment, typically caused by unlevelled demand.
|
muri, overburden, overload |
KAIZEN |
Kaizen |
Continuous improvement; incremental change that eliminates waste.
|
kaizen, continuous improvement, ci |
FLOW_KAIZEN |
Flow Kaizen |
Improvement of material and information flow, requiring a high vantage point; management doing kaizen.
|
flow kaizen, value stream kaizen, system kaizen |
PROCESS_KAIZEN |
Process Kaizen |
Elimination of waste at the shop floor team level, focused on people and process flow.
|
process kaizen, point kaizen, shop floor kaizen |
LEAN_MANUFACTURING |
Lean Manufacturing |
Getting one process to make only what the next process needs when it needs it, linking all processes from consumer back to raw material in a smooth flow.
|
lean manufacturing, lean production, lean, tps, toyota production system |
LEAN_THINKING |
Lean Thinking |
The management philosophy of specifying value, identifying the value stream, creating flow, establishing pull, and pursuing perfection.
|
lean thinking |
DOOR_TO_DOOR_FLOW |
Door-to-Door Flow |
The production flow inside one plant, including shipment to the customer and delivery of supplied material — the level at which mapping should begin.
|
door to door, door-to-door, plant level flow, in-plant flow |
PRODUCT_FAMILY |
Product Family |
A group of products that pass through similar processing steps and over common equipment in your downstream processes.
|
product family, family, part family |
MATERIAL_FLOW |
Material Flow |
The movement of material through the factory, drawn left to right on the bottom half of the map.
|
material flow, physical flow, part flow |
INFORMATION_FLOW |
Information Flow |
The flow that tells each process what to make or do next, drawn right to left on the top half of the map.
|
information flow, info flow, schedule flow |
TAKT_TIME |
Takt Time |
How often you should produce one part, based on the rate of sales: available working time per shift divided by customer demand rate per shift.
|
takt time, takt, tact time, customer takt |
TAKT_IMAGE |
Takt Image |
The shared awareness of pace that exists only when work is released and withdrawn in small consistent increments.
|
takt image, sense of takt, pace awareness |
CYCLE_TIME |
Cycle Time |
The time that elapses between one part coming off a process and the next part coming off — not the total time a part takes through all steps.
|
cycle time, c/t, ct |
CHANGEOVER_TIME |
Changeover Time |
The time to switch a process from producing one product type to another.
|
changeover time, c/o, setup time, set-up time |
PITCH |
Pitch |
The consistent increment of work released and withdrawn at the pacemaker, usually takt time multiplied by pack size.
|
pitch, pitch increment, management time frame |
PRODUCTION_LEAD_TIME |
Production Lead Time |
The time it takes one part to make its way through the shop floor, from arrival as raw material to shipment to the customer.
|
production lead time, lead time, plt |
PROCESSING_TIME |
Processing Time |
The sum of the value-adding times for each process in the value stream.
|
processing time, value added time, va time |
EVERY_PART_EVERY |
Every Part Every |
A measure of production batch size expressed as the interval at which a process changes over to produce all its part variations.
|
every part every, epe, epex, every part every day |
AVAILABLE_WORKING_TIME |
Available Working Time |
Shift length minus breaks, meetings and cleanup — the numerator of takt time.
|
available working time, available time, net operating time |
UPTIME |
Uptime |
The fraction of time a machine actually runs when it is called upon to run.
|
uptime, on demand uptime, reliability, availability |
REPLENISHMENT_LEAD_TIME |
Replenishment Lead Time |
The time a pull loop takes to put withdrawn parts back into the supermarket.
|
replenishment lead time, replenishment time, refill lead time |
CONTINUOUS_FLOW |
Continuous Flow |
Producing one piece at a time, with each item passed immediately from one process step to the next without stagnation.
|
continuous flow |
PUSH |
Push |
A process producing something regardless of the actual needs of the downstream customer process and pushing it ahead, typically to a schedule.
|
push, batch and push, push production |
PULL |
Pull |
A method for controlling production between flows in which downstream withdrawal determines what the upstream process produces, when and how much.
|
pull, pull production, pull system |
SUPERMARKET |
Supermarket |
A controlled inventory of parts used to schedule production at an upstream process; the customer withdraws what it needs and the supplier replenishes.
|
supermarket, market, store, controlled store |
MARKET_ADDRESS |
Market Address |
The specified location in a supermarket where a replenished container must be placed.
|
market address, kanban address, store location |
FIFO_LANE |
FIFO Lane |
A capped, sequenced link between two decoupled processes; when it is full the supplying process must stop producing.
|
fifo lane, fifo, first in first out, conwip |
SEQUENCED_PULL |
Sequenced Pull |
The supplying process produces a predetermined quantity directly to the customer process's order, without a supermarket.
|
sequenced pull, golf ball system, build to sequence |
KANBAN |
Kanban |
A card or device that authorises production or conveyance of a specific quantity of a specific part.
|
kanban, card, signal card |
PRODUCTION_KANBAN |
Production Kanban |
The one-per-container kanban that tells a process how many of what may be produced and gives permission to do so.
|
production kanban, p kanban, make kanban |
WITHDRAWAL_KANBAN |
Withdrawal Kanban |
A card or device that instructs the material handler to get and transfer parts, for example from a supermarket to the consuming process.
|
withdrawal kanban, move kanban, conveyance kanban, transfer kanban |
SIGNAL_KANBAN |
Signal Kanban |
The one-per-batch kanban that signals when a reorder point is reached and another batch needs to be produced.
|
signal kanban, triangle kanban, batch kanban |
KANBAN_POST |
Kanban Post |
The place where kanban are collected and held for conveyance.
|
kanban post, kanban box, card rack, kanban mailbox |
HEIJUNKA |
Heijunka |
Levelling both the mix and the volume of production over a period of time, often using a box with a column per pitch and a row per product type.
|
heijunka, load levelling, load leveling, levelling box, oxox |
PACED_WITHDRAWAL |
Paced Withdrawal |
Regularly releasing a small consistent amount of production instruction at the pacemaker while taking away an equal amount of finished goods.
|
paced withdrawal, paced release, pitch release |
PACEMAKER_PROCESS |
Pacemaker Process |
The single process controlled by the outside customer's orders; how you control it sets the pace for all upstream processes.
|
pacemaker, pacemaker process, pace setter, scheduling point |
LEVELLING_THE_MIX |
Levelling the Mix |
Distributing the production of different products evenly over a time period rather than grouping them into long runs.
|
levelling the mix, leveling the mix, mix levelling, model mix levelling |
LEVELLING_THE_VOLUME |
Levelling the Volume |
Releasing and withdrawing consistent increments of work so the production pace is predictable.
|
levelling the volume, leveling the volume, volume levelling |
INITIAL_PULL |
Initial Pull |
The pull created at the pacemaker by releasing and withdrawing small consistent increments of work.
|
initial pull, starting pull |
MILK_RUN |
Milk Run |
A delivery route lining up several suppliers or customers so material can move frequently in small quantities.
|
milk run, milkrun, circuit delivery, consolidated route |
SAFETY_STOCK |
Safety Stock |
Inventory held as a hedge against problems such as downtime; should be temporary and released only under strict rules.
|
safety stock, hedge stock |
BUFFER_STOCK |
Buffer Stock |
Inventory held to protect against sudden fluctuations in customer orders.
|
buffer stock, buffer |
ISOLATED_ISLAND |
Isolated Island |
A process operating on its own schedule, disconnected from any downstream customer, setting batch sizes that suit itself rather than the value stream.
|
isolated island, island of functionality, disconnected process |
GO_SEE_SCHEDULING |
Go See Scheduling |
Adjusting schedules based on physically checking inventory levels; an informal practice that is not a true pull.
|
go see, go-see scheduling, visual scheduling |
RIGHT_SIZED_TOOL |
Right-Sized Tool |
Small, in-line equipment scaled to the product family's actual volume so it can join a continuous flow.
|
right sized tool, right-sized equipment, mini press |
MONUMENT |
Monument |
A large, fast, shared machine that cannot practically be dedicated to one family or slowed to takt.
|
monument, monument machine, shared fast process |
CELL |
Cell |
An arrangement placing process steps immediately adjacent so operators carry or pass parts from one step to the next.
|
cell, work cell, cellular manufacturing |
VALUE_STREAM_LOOP |
Value Stream Loop |
A segment of the future-state map between pulls, used to break implementation into manageable pieces.
|
value stream loop, loop, pacemaker loop |
SETUP_REDUCTION |
Setup Reduction |
Reducing changeover time so smaller batches can be run more frequently.
|
setup reduction, quick changeover |
POKA_YOKE |
Poka-Yoke |
A device that prevents an error, such as assembling the wrong component when all variants are kept at the line.
|
poka yoke, pokayoke, error proofing, mistake proofing, failsafe |
STANDARDISED_WORK |
Standardised Work |
A documented, repeatable work sequence that makes production consistent and predictable to takt.
|
standardised work, standardized work, standard work |
TOTAL_PRODUCTIVE_MAINTENANCE |
Total Productive Maintenance |
Maintenance practice aimed at eliminating the causes of unplanned downtime.
|
tpm, total productive maintenance, preventive maintenance |
OPERATOR_BALANCE_CHART |
Operator Balance Chart |
A bar chart of total cycle time per process or operator against the takt line.
|
operator balance chart, balance chart, yamazumi chart |
WORK_ELEMENT |
Work Element |
The smallest increment of work that can be moved between operators when balancing a cell.
|
work element, task element, work content element |
TOTAL_WORK_CONTENT |
Total Work Content |
The sum of operator work across a cell; divided by takt it gives the required manning.
|
total work content, work content, total manual time |
POLICY_DEPLOYMENT |
Policy Deployment |
Focusing the organisation on a small number of specific targets, deployed through the levels.
|
policy deployment, hoshin kanri, hoshin |
POLICY_MANAGEMENT |
Policy Management |
A more dynamic evolution of policy deployment in which lower levels help formulate policy as well as carry it out.
|
policy management |
PLAN_BASED_TRIAL_AND_ERROR |
Plan-Based Trial and Error |
Blending planning with trial and error: strive to accomplish the plan while accepting that deviations, once rigorously questioned, teach you something.
|
plan based trial and error, plan-based trial and error |
VALUE_STREAM_REVIEW |
Value Stream Review |
A periodic review, ideally conducted on the shop floor while walking the flow, that manages the exceptions rather than celebrating the wins.
|
value stream review, quarterly review, progress review |
SENSEI |
Sensei |
A teacher whose learning curve you can borrow.
|
sensei, teacher, lean sensei |
CLOSE_TO_THE_OPERATION_SUPPORT |
Close-to-the-Operation Support |
Treating all indirect operations as support for direct operations, with their work tied to the takt and pitch of value-adding operations.
|
close to the operation support, close-to-the-operation support |
KAIZEN_WORKSHOP |
Kaizen Workshop |
A focused improvement activity; effective only when applied strategically inside a value stream design.
|
kaizen workshop, kaizen event, kaizen blitz, improvement blitz |
THEORY_OF_CONSTRAINTS |
Theory of Constraints |
A constraint-focused improvement approach; in isolation it produces the same isolated victories over muda as a kaizen offensive.
|
theory of constraints, toc, bottleneck elimination |
SIX_SIGMA |
Six Sigma |
A variation-reduction initiative; without a value stream design it fixes visible quality problems without improving the whole.
|
six sigma, 6 sigma |
MATERIAL_REQUIREMENTS_PLANNING |
Material Requirements Planning |
A computerised system that consolidates customer and shop-floor information and sends instructions to each process; its shop-floor scheduling elements should be removed in a lean future state.
|
mrp, material requirements planning, erp scheduling |
ELECTRONIC_DATA_INTERCHANGE |
Electronic Data Interchange |
Electronic transmission of orders and forecasts, drawn with a lightning-wiggle information arrow.
|
edi, electronic data interchange |
SHOP_ORDER |
Shop Order |
An order released to the floor that follows a job through the production process; releasing them early is a source of expediting.
|
shop order, works order, production order |
PRIORITY_LIST |
Priority List |
A daily list issued to supervisors to sequence shop orders — a symptom of schedule churn.
|
priority list, daily priority list, hot list |
FORECAST |
Forecast |
Customer projection used for capacity planning; should not be used to schedule the shop floor day to day.
|
forecast, demand forecast, ninety day forecast |
FROZEN_PERIOD |
Frozen Period |
The near-term window in which a customer forecast is fixed.
|
frozen period, frozen horizon, frozen at thirty days |
DAILY_RELEASE |
Daily Release |
The customer's next-day requirement, typically transmitted overnight.
|
daily release, daily order, daily shipping requirement |
SHIPPING_SCHEDULE |
Shipping Schedule |
The instruction sent to the shipping department stating what must ship and when.
|
shipping schedule, despatch schedule, daily shipping schedule |
MAKE_TO_ORDER |
Make to Order |
Production triggered by a confirmed customer order, common where configurations vary greatly.
|
make to order, mto, build to order |
MAKE_TO_STOCK |
Make to Stock |
Production to replenish a finished-goods store from which the customer pulls.
|
make to stock, mts, build to stock |
BUILD_TO_SHIPPING |
Build to Shipping |
Producing to the shipping schedule with no finished-goods supermarket; requires reliability or more safety stock.
|
build to shipping, direct to shipping, produce to shipping |
ORDER_BACKLOG |
Order Backlog |
Accumulated unfulfilled orders, which tempts firms to quote longer lead times rather than shorten them.
|
order backlog, backlog, open order book |
EXPEDITING |
Expediting |
Manual intervention to accelerate specific orders, caused by releasing work too early and by late mix changes.
|
expediting, expedite, chasing, firefighting |
PROCESS_BOX |
Process Box |
The icon indicating one area of material flow, ideally a continuous flow; it stops wherever processes are disconnected.
|
process box, process, operation box |
DATA_BOX |
Data Box |
The box under a process recording cycle time, changeover, uptime, available time and other process data.
|
data box, databox, attribute box |
INVENTORY_TRIANGLE |
Inventory Triangle |
The icon capturing the location and amount of accumulated inventory, annotated with quantity and time.
|
inventory triangle, warning triangle, stock triangle |
OUTSIDE_SOURCE |
Outside Source |
The icon used for customers, suppliers and outside manufacturing processes.
|
outside source, factory icon, external source |
TIMELINE |
Timeline |
The stepped line under the process boxes and triangles that compiles lead time and value-adding time.
|
timeline, lead time bar, saw tooth line |
KAIZEN_BURST |
Kaizen Burst |
The icon highlighting an improvement need critical to achieving the value stream vision.
|
kaizen burst, lightning burst, kaizen lightning |
CURRENT_STATE_MAP |
Current-State Map |
The map of how the value stream operates today, drawn from information gathered by walking the flow.
|
current state map, current state, as is map |
FUTURE_STATE_MAP |
Future-State Map |
The lean design to be implemented within a short period; the most important of the maps.
|
future state map, future state, to be map, ideal state map |
YEARLY_VALUE_STREAM_PLAN |
Yearly Value Stream Plan |
A one-page plan stating step by step what will be done by when, with measurable goals and named reviewers.
|
yearly value stream plan, value stream plan, annual plan |
LEVELS_OF_MAPPING |
Levels of Mapping |
Process level, single plant door-to-door, multiple plants, and across companies — the scales at which a value stream can be mapped.
|
levels of mapping, magnification, zoom level |
PACK_SIZE |
Pack Size |
The number of parts one finished-goods container holds; commonly the basis for kanban size and pitch.
|
pack size, packout quantity, container quantity |
CONTAINER |
Container |
The unit in which parts are held and moved; should be sized for the operator, not the material handler.
|
container, bin, tray, tote, basket |
OPERATOR_ICON |
Operator Icon |
A person viewed from above, drawn in the process box to show manning.
|
operator icon, person icon |
TRIGGER_POINT |
Trigger Point |
The supermarket level at which a signal kanban is sent to launch another batch.
|
trigger point, reorder point, minimum point |
INVENTORY_TURNS |
Inventory Turns |
How many times inventory is consumed and replaced in a year; the financial mirror of production lead time.
|
inventory turns, stock turns, turnover |
VALUE_ADDED_RATIO |
Value-Added Ratio |
Processing time divided by production lead time — the ratio the map exists to expose.
|
value added ratio, flow efficiency, process cycle efficiency |
SCRAP_RATE |
Scrap Rate |
The fraction of output that must be scrapped or reworked.
|
scrap rate, reject rate, rework rate |
FIRST_TIME_THROUGH |
First Time Through |
The fraction of parts that clear a process with no rework, measured at the process rather than at final inspection.
|
first time through, ftt, first pass yield, fpy, first time right, ftr |
PROCESS_CAPACITY |
Process Capacity |
Available work time divided by cycle time, multiplied by uptime; a measure of current capacity if no changeovers are made.
|
process capacity, demonstrated capacity |
BATCH_SIZE |
Batch Size |
The quantity produced between two changeovers.
|
batch size, lot size, run size |
DAYS_OF_SUPPLY |
Days of Supply |
Inventory quantity divided by the daily customer requirement.
|
days of supply, days on hand, inventory days |
DISTANCE_TRAVELLED |
Distance Travelled |
The distance material moves through the plant; a proxy for transport waste.
|
distance travelled, distance traveled, travel distance |
ON_TIME_DELIVERY |
On-Time Delivery |
The fraction of shipments delivered when the customer required them.
|
on time delivery, otd, delivery performance |
VALUE_STREAM_MANAGER |
Value Stream Manager |
The person with lead responsibility for understanding and improving a product family's value stream, reporting to the top person on site.
|
value stream manager, flow manager, product family manager |
LEAN_SPECIALIST |
Lean Specialist |
A coach who helps value stream managers see waste and introduce the practices that remove its sources.
|
lean specialist, lean promotion group, lean coach |
MATERIAL_HANDLER |
Material Handler |
The person who withdraws kanban at the pitch increment and moves containers between supermarket, cell and staging.
|
material handler, water spider, kanban runner |
PRODUCTION_CONTROL |
Production Control |
The department that receives customer orders, levels them, and sends instruction to the single scheduling point.
|
production control, planning department, material control |
CHANGE_AGENT |
Change Agent |
The person who drives the lean transformation forward, ideally the one asking the question.
|
change agent |
PRODUCT_TEAM |
Product Team |
An organisation focused on a product family rather than a department.
|
product team, value stream team |
COIL |
Coil |
A supplier pack unit that cannot be broken; the supplier can deliver any number of full coils but not a partial one.
|
coil, steel coil, coiled steel |
OUTSIDE_VENDOR |
Outside Vendor |
An operation performed off site, such as painting, which adds transport and lead time in the middle of the stream.
|
outside vendor, outside process, subcontractor, external operation |
RECEIVING_DOCK |
Receiving Dock |
The plant boundary where supplied material arrives and where an inbound supermarket can be held.
|
receiving dock, goods inward, inbound dock |
STAGING_AREA |
Staging Area |
Where finished goods are assembled according to the shipping schedule before loading.
|
staging area, shipping lane, marshalling area |
FINISHED_GOODS |
Finished Goods |
Completed product held before shipment, either in a supermarket the customer pulls from or staged directly for shipping.
|
finished goods, fg, finished stock |
WORK_IN_PROCESS |
Work in Process |
Partly finished material between process steps.
|
work in process, wip, work in progress |
RAW_MATERIAL |
Raw Material |
Supplied material before the first process, drawn at the far left of the map.
|
raw material, raw stock, incoming material |
RETURNABLE_PACKAGING |
Returnable Packaging |
Customer-specified packaging that circulates between plants and constrains pack size.
|
returnable packaging, returnable trays, reusable container |
LINE_BALANCING |
Line Balancing |
Assigning work elements to operators so the operator times are as even as possible and no element starts before its predecessors finish.
|
line balancing, line balance, balancing, station balancing, assembly line balancing |
PRECEDENCE_DIAGRAM |
Precedence Diagram |
A left-to-right chart of which work elements must be completed before others can begin; the blueprint a balance has to obey.
|
precedence diagram, precedence graph, precedence network, predecessor diagram |
PREDECESSOR_ELEMENT |
Predecessor Element |
A work element that must be finished before another can start, constraining which operator can be given the later element.
|
predecessor element, immediate predecessor, preceding element, predecessor |
UNIT_TIME |
Unit Time |
The sum of the standard element times, being the total work required to build one unit; written Σtₑ.
|
unit time, total unit time, standard work time per unit, sum of element times |
SHIFT_TIME |
Shift Time |
Total working time in one shift after lunch and breaks are taken out; the T in the manning and cycle time formulas.
|
shift time, shift working time, net shift time |
SHIFT_SCHEDULE_QUANTITY |
Shift Schedule Quantity |
The number of finished units the shift is meant to complete; the N that fixes both the cycle time and the number of operators.
|
shift schedule, shift schedule quantity, shift quantity, units per shift |
AVERAGE_OPERATOR_TIME |
Average Operator Time |
Unit time divided by the number of operators: the work each operator would carry if the work divided perfectly evenly.
|
average operator time, average operation time, average station time |
EFFECTIVE_CYCLE_TIME |
Effective Cycle Time |
The largest of the operator times, and so the real interval between finished units, however fast the schedule asked the line to run.
|
effective cycle time, achieved cycle time, actual cycle time |
BALANCE_DELAY |
Balance Delay |
The share of paid operator time spent idle because work was assigned unevenly: the gap between the effective cycle time and the average operator time, as a fraction of the former.
|
balance delay, balancing loss, idle time fraction, balance loss |
EFFICIENCY_RATIO |
Efficiency Ratio |
Average operator time divided by effective cycle time; the complement of balance delay, so the two always sum to one.
|
efficiency ratio, line efficiency, balance efficiency |
PARALLEL_STATION |
Parallel Station |
Two or more identical stations working alternate units, used when one element takes longer than takt and cannot be divided.
|
parallel station, parallel stations, duplicate station, parallel work place |
LABOR_GROUP |
Labor Group |
A set of operators whose work elements are mutually exclusive from every other set, such as a paint booth or a feeder line, each with its own schedule and cycle time.
|
labor group, labour group, labor groups |
FEEDER_LINE |
Feeder Line |
A line that builds a component fed into the main line, synchronised to it so the two flows stay in step.
|
feeder line, feeder lines, subassembly line, sub assembly line |
MIXED_MODEL_ASSEMBLY |
Mixed Model Assembly |
One line building two or more models at the same time, balanced on the work each element takes over the whole shift rather than on one unit.
|
mixed model assembly, mixed model line, mixed model |
USAGE_INDEX |
Usage Index |
Whether a given work element is used by a given model; what makes mixed-model balancing differ from single-model balancing.
|
usage index, element usage, model usage index |
MAKE_TO_ORDER_ASSEMBLY |
Make to Order Assembly |
Assembly where each unit is a customer order with its own combination of features and options, so the element times at a station vary unit by unit.
|
make to order assembly, make-to-order assembly, mto assembly, order driven assembly |
SIMILARITY_INDEX |
Similarity Index |
The share of work content a set of models holds in common; a numeric test of whether they belong on one line and one map.
|
similarity index, model similarity, commonality index |
BILL_OF_MATERIAL |
Bill of Material |
The parts and quantities needed for one unit, which combined with the balance gives the parts each station must be stocked with for a shift.
|
bill of material, bill-of-material, bom, parts list |
PRIME_ELEMENT |
Prime Element |
The first work element to use a given part, which is what decides the station that part must be delivered to.
|
prime element, first element using part |
SHOP_FLOOR_MANAGEMENT |
Shop Floor Management |
Leading at the point of value creation rather than from an office: managers observe the process where it runs and support it, resting on four interlocking elements — visual management, a communication structure, a problem-solving process, and standard-based process observation.
|
shop floor management, shopfloor management, sfm, management at the shop floor, lead on the spot |
VISUAL_MANAGEMENT |
Visual Management |
Making the state of a process visible where it runs, so a deviation from the standard is seen by the people who can answer it rather than reported upwards later.
|
visual management, visual control, visual factory, shopfloor board, management board |
KEY_FIGURE |
Key Figure |
A number carried on the shop floor board to show whether a process is meeting its standard; useful only while it is current, since short-cycle management cannot act on a figure that describes last month.
|
key figure, key figures, shopfloor key figure, kpi, key performance indicator, key performance indicators |
SHORT_CYCLE_CONTROL |
Short Cycle Control |
Managing a process in fixed short intervals — the shift, the hour, the pitch — so a deviation is caught within the interval it happened in instead of at the end of the month.
|
short cycle control, short-cycle control, short cycle management, short interval control, short-cycle basis |
DEVIATION_FROM_STANDARD |
Deviation from Standard |
The gap between what a process is doing and the standard that describes it; the only trigger shop floor management acts on, and the reason a standard must exist before an improvement can be claimed.
|
deviation from standard, deviation from the standard, standard deviation from work, off standard, abnormality |
STANDARD_BASED_PROCESS_OBSERVATION |
Standard-Based Process Observation |
Watching a running process against its written standard, which is what turns a standard from a document into a check that the work is still being done the way it was agreed.
|
standard based process observation, standard-based process observation, process observation, process confirmation |
ESCALATION |
Escalation |
The agreed route by which an unanswered deviation reaches the next management level, pulled by the process the way a kanban is pulled by consumption rather than pushed by a report.
|
escalation, escalation path, escalation ladder, call for support |
PROBLEM_SOLVING_PROCESS |
Problem-Solving Process |
A defined sequence for taking a deviation to its cause and a countermeasure, so problems are closed by evidence rather than by opinion.
|
problem solving process, problem-solving process, structured problem solving, eight disciplines, 8d |
GEMBA_WALK |
Gemba Walk |
Going to the place where the work happens to see the process for oneself; the habit that makes every other shop floor practice possible.
|
gemba walk, gemba, go and see, walk the floor, shop floor walk |
A3_REPORT |
A3 Report |
A problem, its analysis, its countermeasures and its follow-up set out on one sheet, so the reasoning is visible and can be argued with.
|
a3 report, a3, a3 sheet, one page report |
PDCA_CYCLE |
PDCA Cycle |
Plan, do, check, act: the loop that makes an improvement an experiment with a result rather than a change with an opinion.
|
pdca, pdca cycle, plan do check act, plan-do-check-act, deming cycle, demings cycle |
IMPROVEMENT_KATA |
Improvement Kata |
A repeated routine for improving towards a target condition in small steps, each step a PDCA cycle, so the capability to improve is practised rather than assumed.
|
improvement kata, kata, coaching kata, toyota kata |
TARGET_CONDITION |
Target Condition |
The state a process is to reach next, described precisely enough that reaching it is a fact rather than a judgement; the object of the improvement kata.
|
target condition, target state, next target condition |
JIDOKA |
Jidoka |
The second pillar of the Toyota Production System: a process detects its own abnormality and stops, decoupling the operator from the machine so a defect is contained where it was made instead of being passed on.
|
jidoka, autonomation, automation with a human touch, quality at the source, built in quality |
ANDON |
Andon |
Japanese for lantern: the signal a process raises when it cannot meet its standard, and — as a board combining several signals in one place — the means by which support knows where to go without being told.
|
andon, andon board, andon cord, andon light, signal lamp |
OVERALL_EQUIPMENT_EFFECTIVENESS |
Overall Equipment Effectiveness |
Good parts against what the planned working time could have produced, as the product of the availability, performance and quality factors; it deliberately excludes utilisation losses, because time nobody scheduled is not a loss the process caused.
|
oee, overall equipment effectiveness, equipment effectiveness, plant effectiveness |
AVAILABILITY_FACTOR |
Availability Factor |
Production time over possible operating time: the share of scheduled time the plant was actually able to run, lost to breakdowns, adjustment and set-up.
|
availability factor, technical availability, plant availability |
PERFORMANCE_FACTOR |
Performance Factor |
Parts produced against the target output for the time the plant ran: what short stops, idling and reduced speed cost, once availability has already been accounted for.
|
performance factor, performance rate, speed factor, performance efficiency |
QUALITY_FACTOR |
Quality Factor |
Good parts over produced parts, counting rework as a loss; the third factor of OEE.
|
quality factor, quality rate, yield factor |
UTILISATION_FACTOR |
Utilisation Factor |
Possible operating time over the twenty-four hours of a day. It is the one loss OEE leaves out, and reporting it in place of effectiveness is what makes a plant chase running time instead of good parts.
|
utilisation factor, utilization factor, plant utilisation, plant utilization |
MASTER_ROUTE_SHEET |
Master Route Sheet |
The document listing every operation a part passes through with its times and resources; the source a current-state map is checked against once the flow has been walked.
|
master route sheet, route sheet, routing sheet, process route sheet |
ECONOMICAL_BATCH_QUANTITY |
Economical Batch Quantity |
The batch size at which set-up cost and holding cost balance. It is an answer to a question lean changes: reduce the set-up and the economical batch falls, which is why quick changeover comes before batch-size arithmetic.
|
economical batch quantity, ebq, economic batch quantity, economic order quantity, eoq |
RETURN_ON_INVESTED_CAPITAL |
Return on Invested Capital |
Operating profit against the capital tied up to earn it; the measure through which inventory reduction and floor space released show up as a business result rather than a shop floor one.
|
return on invested capital, roic, return on capital |
OPERATOR_CYCLE_TIME |
Operator Cycle Time |
The time one operator spends on a unit, including walking, loading and any work done while the machine runs. It is the figure a cell is balanced on, not the machine's automatic time.
|
operator cycle time, operator ct, manual cycle time, associate cycle time |
MACHINE_CYCLE_TIME |
Machine Cycle Time |
The time the machine runs unattended after it has been loaded. In a cell this is in-cycle only when the operator has other work to do while it runs; otherwise the operator waits on the machine.
|
machine cycle time, automatic cycle time, auto cycle, machine auto time, automatic time |
IN_CYCLE_WORK |
In-Cycle Work |
Operator work that can be done while the machine is running. Moving work into the automatic cycle is how a cell absorbs walking and loading without adding stations.
|
in cycle work, in-cycle work, work during auto, internal work |
OUT_OF_CYCLE_WORK |
Out-of-Cycle Work |
Operator work that can only be done while the machine is stopped — load, unload, inspect. It sets a floor under the operator cycle that no amount of walking reduction will beat.
|
out of cycle work, out-of-cycle work, external work at the machine |
STANDARD_WIP |
Standard WIP |
The exact number of pieces a cell is allowed to hold so one-piece flow stays one-piece. More than the standard is overproduction; less starves the next operator.
|
standard wip, standard work in process, standard in-process stock, swip, fixed wip |
WORK_COMBINATION_TABLE |
Work Combination Table |
The sheet that plots each operator's manual work, walking and machine auto time against takt, so a cell can be manned from evidence rather than from habit.
|
work combination table, work combo table, operator balance table, standard work combination sheet |
FIXED_POSITION_STOP |
Fixed-Position Stop |
A line that stops only at a station boundary when a problem is pulled, so a defect is contained without crashing mid-cycle work.
|
fixed position stopping, fixed position stopping system, fixed position stop, line stop at station |
MULTI_MACHINE_HANDLING |
Multi-Machine Handling |
One operator running several machines in a cell, possible only when walking is short and machine auto time covers the walk to the next load.
|
multi machine handling, multi-machine handling, one operator several machines |
U_SHAPED_CELL |
U-Shaped Cell |
A cell laid out so the operator starts and finishes at the same end, cutting walk and making manning flexible: one person can run the whole U, or several can split it, without moving machines.
|
u-shaped cell, u cell, u-cell, horseshoe cell |
ONE_PIECE_FLOW |
One-Piece Flow |
Moving one unit at a time to the next step as soon as the work is done. Batching inside a cell is still a batch, however small the cell looks on the map.
|
one piece flow, one-piece flow, 1x1 flow, single piece flow |
CROSS_TRAINING |
Cross-Training |
Operators who can run more than one station in the cell, which is what lets manning follow takt instead of following job titles.
|
cross training, cross-training, multi skill, multi-skill, flexible operators |
INTERNAL_SETUP |
Internal Setup |
Setup work that can only be done while the machine is stopped. SMED's first move is to stop treating external work as internal.
|
internal setup, internal changeover, inside setup, ied |
EXTERNAL_SETUP |
External Setup |
Setup work that can be done while the machine is still running the previous job — staging the next die, preheating, fetching tools.
|
external setup, external changeover, outside setup, oed |
SINGLE_MINUTE_EXCHANGE_OF_DIE |
Single-Minute Exchange of Die |
Shingo's method for taking a changeover under ten minutes: separate internal from external, convert internal to external, then streamline what must still stop the machine.
|
smed, single minute exchange of die, smed system, single-minute exchange, quick die change |
ONE_TOUCH_EXCHANGE |
One-Touch Exchange |
A changeover reduced to a single motion, the end-state SMED aims at once internal work has been designed out.
|
one touch exchange, oted, one-touch exchange of die |
SOURCE_INSPECTION |
Source Inspection |
Checking the conditions that cause a defect before the defect can be made, rather than inspecting the part after. Shingo's name for the only inspection that can reach zero defects.
|
source inspection, source check, inspection at the source |
JUDGMENT_INSPECTION |
Judgment Inspection |
Sorting good from bad after the fact. It finds defects; it does not prevent them, and it does not belong in a future-state data box as a quality strategy.
|
judgment inspection, sorting inspection, go no-go inspection |
INFORMATIVE_INSPECTION |
Informative Inspection |
Sampling after the fact to feed information back. Faster than judgment inspection at reducing defects, still too late to reach zero.
|
informative inspection, statistical inspection, spc inspection |
SELF_CHECK |
Self-Check |
The operator inspects the unit they just made, immediately. Faster feedback than a downstream inspector, still a check after the error.
|
self check, self-check, operator self inspection |
SUCCESSIVE_CHECK |
Successive Check |
The next process inspects the last process's work before starting its own. Catches what self-check missed; still not source inspection.
|
successive check, successive inspection, next process check |
ZERO_QUALITY_CONTROL |
Zero Quality Control |
Shingo's system: source inspection plus poka-yoke, aimed at zero defects rather than at an acceptable quality level.
|
zero quality control, zqc, zero qc, zero defects system |
POKA_YOKE_DEVICE |
Poka-Yoke Device |
A physical contact, counting or motion-step device that either stops the process when a condition is wrong or prevents the wrong action from being possible.
|
poka-yoke device, mistake proofing device, error proofing device, failsafe device |
PROCESS_VERSUS_OPERATION |
Process versus Operation |
Shingo's distinction: a process is the path a product takes; an operation is what a person or machine does at one place. Improving operations inside a wasteful process leaves the waste.
|
process and operation, network of processes and operations, process versus operation, process vs operation |
NON_STOCK_PRODUCTION |
Non-Stock Production |
Producing without the warehouses that batch-and-queue treats as normal. The aim of TPS as Shingo wrote it, not a side effect of faster machines.
|
non stock production, non-stock production, stockless production |
A3_THINKING |
A3 Thinking |
Using a single sheet to make the problem, the reasoning and the proposed action visible so a manager coaches judgment rather than issuing answers. The sheet is the residue; the conversation is the work.
|
a3 thinking, a3 management, managing to learn |
NEMAWASHI |
Nemawashi |
Preparing the roots before the tree is moved: talking the proposal through with everyone it will touch, so the decision when it comes is already understood.
|
nemawashi, root binding, consensus building |
CATCHBALL |
Catchball |
Passing a proposal up and down the organisation so each level adds what only it can see, rather than cascading a finished plan.
|
catchball, catch ball, hoshin catchball |
PROBLEM_SOLVING_A3 |
Problem-Solving A3 |
An A3 whose left side states the background, current condition, goal and root cause, and whose right side states countermeasures, a plan and follow-up.
|
problem solving a3, problem-solving a3, a3 problem solving |
PROPOSAL_A3 |
Proposal A3 |
An A3 written to recommend a course of action, still built on a current-condition and a gap, so the recommendation can be argued with.
|
proposal a3, a3 proposal |
VALUE_STREAM_MANAGEMENT |
Value Stream Management |
The eight-step process that turns a map into a managed programme: commit, choose the family, learn lean, map current, map future, kaizen plans, implement, and keep the gains.
|
value stream management, vsm process, vsmp, value stream management process |
KAIZEN_PLAN |
Kaizen Plan |
The dated, named actions that take a future-state map off the wall and onto the floor, loop by loop, with a reviewer for each step.
|
kaizen plan, implementation plan, loop plan |
DEMAND_AMPLIFICATION |
Demand Amplification |
The way a small change in customer demand becomes a large swing upstream when each process adds its own batch, forecast and safety. The map shows it as inventory triangles growing toward the supplier.
|
amplified as you move upstream, demand amplification, bullwhip, schedule amplification |
PERCENT_COMPLETE_AND_ACCURATE |
Percent Complete and Accurate |
The share of work a process receives that it can act on without going back for missing or wrong information. Rolled across the stream it is the information-flow twin of first-time-through.
|
percent complete and accurate, %c&a, c&a, complete and accurate, percent c and a, rolled c&a |
PROCESS_TIME |
Process Time |
The time someone is actually working on the item. Martin and Osterling keep it separate from lead time so a box that is busy for minutes and waits for days cannot hide behind one number.
|
process time, touch time, work time, hands-on time |
LEAD_TIME_VERSUS_PROCESS_TIME |
Lead Time versus Process Time |
The gap the timeline exists to show: how long the item waits versus how long it is worked. A practical map states both, or it is a process list.
|
process time and lead time, lead time versus process time, wait versus work |
VALUE_CREATING_TIME |
Value-Creating Time |
Work the customer would pay for, as distinct from necessary non-value work (compliance, changeover) and pure waste. A data box that only has cycle time cannot make that cut.
|
value creating time, value-creating time, value creating, necessary non value adding |
PAPER_KAIZEN |
Paper Kaizen |
Leaving wasteful work elements out while the cell is still on paper. Rother and Harris insist on it before any machine moves, because waste designed out costs nothing and waste built in has to be removed twice.
|
paper kaizen, kaizen on paper, paper improvement |
LEVELS_OF_AUTOMATION |
Levels of Automation |
The ladder from a machine that only cuts to one that loads, cycles, unloads and ejects unaided. The great divide is auto-eject: below it an operator must stand and wait for the part, above it the operator can walk to the next machine, which is what makes multi-process handling possible at all.
|
levels of automation, automation level, level 3 automation, great divide in automation |
AUTO_EJECT |
Auto-Eject |
The machine returns the finished part on its own. Rother and Harris call for it wherever the operator needs both hands on the part, because without it the part is double-handled and the cell pays for the same motion twice.
|
auto eject, auto-eject, automatic ejection, part ejection |
CONCENTRATED_WAITING |
Concentrated Waiting |
Loading every operator but one to nearly a full takt and leaving the remaining slack on a single operator, rather than spreading the idle time thinly across the cell. Spread evenly, the waste is invisible and permanent; concentrated, it is the next kaizen and can be removed.
|
concentrated waiting, concentrate the waiting, load all but one operator, waiting on one operator |
MULTI_PROCESS_HANDLING |
Multi-Process Handling |
One worker taking a part through several *different* processes, laid out in flow order. Shingo's worked example puts two workers through three processes and gains 27% on output per worker without buying a machine, because the part stops waiting between operations.
|
multi process handling, multi-process handling, multiprocess handling, handling several processes |
MULTIPLE_MACHINE_HANDLING |
Multiple Machine Handling |
One worker minding several machines doing the *same* operation. It raises machine utilisation and leaves the part waiting between processes, which is why Shingo treats it as the weaker of the two arrangements and multi-process handling as the aim.
|
multiple machine handling, several machines one worker, machine handling operation |
NAGARA_SYSTEM |
Nagara System |
Carrying out dissimilar operations in one smooth movement rather than as separate scheduled steps. Shingo puts it alongside levelling as the way a plant absorbs mix without holding stock between operations.
|
nagara, nagara system, smooth production flow |
PRE_AUTOMATION |
Pre-Automation |
Separating worker from machine and giving the machine the ability to stop itself, without buying full automation. Shingo's point is that almost all the benefit of automation comes from this step, and almost all the cost comes after it.
|
pre automation, pre-automation, autonomation with a human touch, toward pre-automation |
LOAD_AND_CAPACITY_BALANCE |
Load and Capacity Balance |
Load is the work that has to be done; capacity is what machine and operator can do. Toyota calls holding the two in balance "levelling", and Shingo's instruction for reaching it is to round down the peaks and fill in the valleys at the final process.
|
load and capacity, balancing load and capacity, excess capacity, load versus capacity |
LOT_DELAY |
Lot Delay |
The wait a finished piece spends beside the rest of its lot before the lot moves. It is invisible in cycle time and it is most of the lead time in batch production, which is why Shingo separates it from process delay.
|
lot delay, lot waiting, batch delay |
PROCESS_DELAY |
Process Delay |
The wait a whole lot spends before the next process can take it. Shingo pairs it with lot delay so a map can say which of the two a countermeasure would actually remove.
|
process delay, process waiting, queue delay |
ORDER_POINT_METHOD |
Order Point Method |
Replenishing when stock falls to a calculated point rather than to a schedule. Shingo treats it as the ancestor of kanban and is explicit about the limit: it regulates quantity well and does nothing about overproduction between the points.
|
order point, order point method, o.p. method |
CONTROL_METHOD_POKA_YOKE |
Control Method Poka-Yoke |
A poka-yoke that stops the machine or the line when the condition is wrong. Shingo's preferred regulatory function, because it does not depend on anyone noticing.
|
control method, control type poka-yoke, shutdown poka-yoke |
WARNING_METHOD_POKA_YOKE |
Warning Method Poka-Yoke |
A poka-yoke that raises a buzzer or a light and lets production continue. Shingo rates it a weaker regulatory function precisely because defects keep coming if the signal is missed.
|
warning method, warning type poka-yoke, alarm poka-yoke, buzzer or light |
CONTACT_METHOD |
Contact Method |
Detecting the wrong condition by physical contact — a pin, a limit switch, a shape that will not seat. The most robust of the three setting methods because it needs no counting and no attention.
|
contact method, contact poka-yoke, physical contact detection |
FIXED_VALUE_METHOD |
Fixed-Value Method |
Detecting an abnormality by checking that a fixed number of motions or parts happened — ten strips of tape, six screws. Shingo's answer to the operation that is right only when it is complete.
|
fixed value method, fixed-value method, constant value method, counting poka-yoke |
MOTION_STEP_METHOD |
Motion-Step Method |
Detecting an abnormality by checking that the steps happened in the required order. It catches the omission that leaves a good-looking part with a step missing.
|
motion step method, motion-step method, sequence poka-yoke, step sequence check |
ONE_HUNDRED_PERCENT_INSPECTION |
One Hundred Percent Inspection |
Checking every piece rather than a sample. Shingo's argument is that this is affordable only when the check is built into the process as a poka-yoke; done by people it is expensive, tiring and still misses defects.
|
100 percent inspection, one hundred percent inspection, full inspection |
FOUR_CONCEPTUAL_STAGES_OF_SMED |
Four Conceptual Stages of SMED |
Preliminary: internal and external setup are not distinguished. Stage 1: separate them. Stage 2: convert internal to external. Stage 3: streamline every remaining element. The order is the method; skipping to stage 3 buys minutes where stages 1 and 2 buy hours.
|
four conceptual stages, smed stages, four stages of smed |
FUNCTIONAL_CLAMP |
Functional Clamp |
A fastening that holds with one motion — pear-shaped hole, U-slot, cam — instead of a bolt that has to be wound out along its whole thread. Shingo's point about bolts is that only the last turn tightens and only the first loosens; the rest is waste.
|
functional clamp, functional clamping, one turn attachment, one-turn attachment |
BOLTLESS_METHOD |
Boltless Method |
Holding the die or tool without threaded fasteners at all — wedges, springs, magnets, taper pins. The end of the road that functional clamping starts down.
|
boltless method, boltless fastening, no bolt clamping |
INTERMEDIATE_JIG |
Intermediate Jig |
A standard plate the next tool is set up on off-line, so the machine only ever receives one shape. It converts centring and squaring — classic internal work — into external work.
|
intermediate jig, intermediate jigs, standard mounting plate |
DIE_HEIGHT_STANDARDISATION |
Die Height Standardisation |
Making every die the same working height so shut-height adjustment disappears. Shingo is emphatic that eliminating an adjustment beats automating it.
|
die height, die heights, standardise die height, shut height standardisation |
PARALLEL_SETUP_OPERATIONS |
Parallel Setup Operations |
Two people working the changeover at once, front and back of the press, so a twelve-minute setup becomes six rather than twelve minutes of one person walking around the machine.
|
parallel operations, parallel setup, two person changeover |
ADJUSTMENT_ELIMINATION |
Adjustment Elimination |
Replacing "set it and try it" with fixed settings, gauges and stops. Adjustment is the part of a changeover that has no fixed duration, which is why it dominates the times nobody can predict.
|
adjustment elimination, eliminate adjustment, no adjustment setup |
ACTIVE_IMPROVEMENT |
Active Improvement |
Changing what is made and how it is designed to be made, rather than working faster at what already exists. Shingo pairs it with passive improvement and is clear which one has the bigger ceiling.
|
active improvement, improvement of the object |
PASSIVE_IMPROVEMENT |
Passive Improvement |
Accepting the object and the process as given and improving the motions inside them. Necessary, bounded, and the trap a plant falls into when it never asks whether the operation should exist.
|
passive improvement, improvement of the method only |
LOW_VOLUME_MIXED_MODEL_PRODUCTION |
Low-Volume Mixed-Model Production |
Making many variants in small quantities to order. Shingo's treatment is the answer to the objection that levelling only works for high volume: it is changeover, not volume, that decides whether mixed models can be run.
|
low volume mixed model, mixed model production, build to order production, low volume production |
BUFFER_RESOURCES |
Buffer Resources |
Resources held ready to absorb variation in what the customer asks for, so takt can still be met when the volume is not exactly what was planned. They have to be available immediately — a buffer that needs a budget conversation is not a buffer.
|
buffer resource, buffer resources |
SAFETY_RESOURCES |
Safety Resources |
Resources held against the plant's own failures — an absent person, a system down — as opposed to buffer resources, which cover variation in demand. Keeping the two separate stops one shortage being explained away by the other.
|
safety resource, safety resources |
PITCH_BOARD |
Pitch Board |
A board that releases work by pitch increment and shows, within the increment, whether the pace is being held. Its virtue is that a problem is visible in one pitch rather than at the end of the day.
|
pitch board, pitch increment board |
RUNNER |
Runner |
The person who moves work and kanban on a fixed route at the pitch. Tapping and Shuker's image is a post office: the heijunka box holds the mail and the runner delivers it on a timetable.
|
runner, material handler route, pitch runner |
IN_PROCESS_SUPERMARKET |
In-Process Supermarket |
A controlled store of work between two office processes, picked from rather than pushed into, so the downstream process takes what it can do and the upstream process replenishes what was taken.
|
in-process supermarket, in process supermarket, office supermarket |
LEAN_METRICS |
Lean Metrics |
The few measures a value stream is actually steered by, chosen so each one can be broken into components that name a specific waste. A measure that cannot be decomposed cannot direct an improvement.
|
lean metrics, lean measurables, office metrics |
PULL_BASED_AUTHORITY |
Pull-Based Authority |
Authority earned by taking responsibility at the level where the work happens, rather than issued with a job title. Shook separates responsibility from authority deliberately: the A3 owner has the first and has to pull the second.
|
pull based authority, pull-based authority, authority pulled not granted |
RESPONSIBILITY_WITHOUT_AUTHORITY |
Responsibility Without Authority |
The normal condition of an A3 owner, and the point of the method rather than a flaw in it: agreement has to be won from the people who hold the resources, which is what makes the reasoning on the sheet matter.
|
responsibility and authority, responsibility without authority, ownership without authority |
ACTIVITY_RATIO |
Activity Ratio |
Total process time divided by total lead time, printed on the map header beside rolled %C&A. On the book's own example map it is 3.9%, which is the number that ends the argument about whether the stream is busy or waiting.
|
activity ratio, process time over lead time, activity rate |