PROCESS_BOX |
Manufacturing Process |
material
|
process box, process, operation box, manufacturing process |
OUTSIDE_SOURCE |
Outside Sources |
material
|
outside source, factory icon, customer icon, supplier icon, external process |
DATA_BOX |
Data Box |
material
|
data box, databox, process data, attribute box |
INVENTORY_TRIANGLE |
Inventory |
material
|
inventory triangle, warning triangle, inventory icon, stock triangle, triangle |
TRUCK_SHIPMENT |
Truck Shipment |
material
|
truck, truck shipment, shipment icon, lorry, freight |
PUSH_ARROW |
Movement of Production Material by PUSH |
material
|
push arrow, push, striped arrow, push movement |
FINISHED_GOODS_ARROW |
Movement of Finished Goods to the Customer |
material
|
finished goods arrow, broad arrow, shipment arrow, delivery arrow |
SUPERMARKET |
Supermarket |
material
|
supermarket, market, store, controlled inventory, kanban supermarket |
WITHDRAWAL |
Withdrawal |
material
|
withdrawal, physical pull, pull arrow, withdrawal arrow |
FIFO_LANE |
FIFO Lane |
material
|
fifo, fifo lane, first in first out, conwip, sequenced lane |
SAFETY_BUFFER_STOCK |
Buffer or Safety Stock |
general
|
safety stock icon, buffer stock icon, buffer, hedge stock |
MANUAL_INFO_FLOW |
Manual Information Flow |
information
|
manual information flow, manual info, straight arrow, paper schedule |
ELECTRONIC_INFO_FLOW |
Electronic Information Flow |
information
|
electronic information flow, edi, lightning arrow, electronic data interchange, wiggle arrow |
INFO_NODE |
Information |
information
|
information node, info box, small box, label node |
PRODUCTION_KANBAN |
Production Kanban |
information
|
production kanban, p-kanban, make kanban, one-per-container kanban |
WITHDRAWAL_KANBAN |
Withdrawal Kanban |
information
|
withdrawal kanban, move kanban, w-kanban, conveyance kanban, transfer kanban |
SIGNAL_KANBAN |
Signal Kanban |
information
|
signal kanban, triangle kanban, one-per-batch kanban, reorder kanban |
SEQUENCED_PULL_BALL |
Sequenced-Pull Ball |
information
|
sequenced pull ball, golf ball, sequence pull, pull ball, golf ball system |
KANBAN_POST |
Kanban Post |
information
|
kanban post, kanban box, card rack, kanban mailbox |
KANBAN_ARRIVING_IN_BATCHES |
Kanban Arriving in Batches |
information
|
kanban in batches, batched kanban, kanban batch |
LOAD_LEVELLING |
Load Levelling |
information
|
load levelling, load leveling, heijunka, oxox, levelling box, heijunka box |
GO_SEE_SCHEDULING |
"Go See" Production Scheduling |
information
|
go see, go-see scheduling, eyeglass icon, visual scheduling, go and see |
KAIZEN_BURST |
Kaizen Lightning Burst |
general
|
kaizen burst, lightning burst, kaizen lightning, improvement burst, kaizen star |
OPERATOR |
Operator |
general
|
operator, operator icon, person icon, associate |
TIMELINE |
Lead Time / Value-Added Timeline |
general
|
timeline, lead time bar, sawtooth, time ladder, lead-time bars |
PRODUCTION_CONTROL |
Production Control |
information
|
production control, scheduling department, mrp box, planning, material control |
CELL |
Cell |
material
|
cell, cellular layout, work cell, cell schematic |
MILK_RUN |
Milk Run |
material
|
milk run, milkrun, consolidated route, circuit delivery |